Performed the emission measurements and function checks, calibrations mandated by law for the automatically operated metrology devices at a large waste incineration plant with four furnace lines in Bavaria (waste throughput: approximately 450,000 tons p.a.).
The prerequisite for conducting the emission measurements was the certification as a metrology authority pursuant to Section 29b BImSchG (Bundesimmissionsschutzgesetz [Federal Pollution Control Act]), which – in addition to us – is held by only very few companies in Germany.
The Munich-based DeepTech startup tozero is establishing a pilot plant for lithium-ion battery recycling at the GENDORF Chemical Park.
Rund 40 leitende Vertreter lokaler Einsatz- und Hilfsorganisationen folgten der Einladung von InfraServ Gendorf zu einem neu konzipierten Fachdialog Sicherheit.