The concept development is based on a thorough review of the loads that need to be supplied by the backup power plant (BPP) by relying on load specific data and on details concerning their startup and feedback behavior. Building on this, we then develop a grid structure (single line) that integrates the grid structure at the installation location. We take care of the design and also manage the RFP with manufacturers. Our range of services is rounded out by planning and erecting switchgear, by developing an add-in and shut down description, and by preparing the inspection and maintenance planning documentation. In addition, we also assist you with the regulatory permitting process for constructing the BPP.
Ein Leck in einer gasführenden Leitung, austretende Stoffe sowie mehrere brennende Fahrzeuge: Mit einem anspruchsvollen Szenario hat der Chemiepark GENDORF seine diesjährige Notfallgroßübung durchgeführt.
Unter dem Motto „Overture to a New Age“ lädt InfraServ Gendorf gemeinsam mit dem Symphonischen Blasorchester Gendorf e.V. am 13. November 2026 zum traditionellen Herbstkonzert in das Betriebsrestaurant des Chemieparks GENDORF ein.